Ground freezing was used to complete a shaft excavation that had been previously attempted using a slurry diaphragm wall and jet grouting. The freezing was completed around both the damaged shaft and the existing tunnel.
Read MoreSistema de Potabilización Área Norte – Access Shaft #3
After groundfreezing, the joint venture was successfully able to construct a permanent access shaft structure without any of the prior leaks, soil movement, or other problems.
Read MorePort of Miami Tunnel
Ground freezing was selected to provide ground stabilization and water cut-off for Port of Miami Tunnel Cross Passages 2 and 3, located eighty to one hundred and twenty feet below sea level.
Read MoreNo. 7 Line Extension Project
Ground freezing was chosen to safely maintain stability, restrict groundwater inflow and limit settlement of the overlying structures to support hand-mining excavation.
Read MoreEastside CSO
The East Side Combined Sewer Outflow (CSO) Tunnel Project located in Portland, Oregon involved providing a ground freezing system to assist in the hand-mining of a tunnel between the existing Confluent Shaft and the new Port Center Shaft.
Read MoreBoston Central Artery Tunnel
Ground freezing enabled the jacking of three massive tunnels just beneath seven active Amtrak lines serving Boston’s South Station and the financial district.