This paper describes the field and laboratory testing as well as the engineering analysis required for freezing to permit excavation below the existing liner plates and into the underlying bedrock.
Read MoreCombined Sewer Overflow Tunnel
The overall project involved the freezing of four shafts excavated by conventional methods, plus an additional two shafts which were raise bored through frozen ground.
Read More