Remediation of Distressed Frozen Earth Cofferdams
Largest Frozen Ground Excavation in North America For Excavation of Crown Pillar
Gibson County Coal Mine
Forty, 4-inch diameter, steel closed-end freeze pipes, plus a comprehensive array of piezometers and temperature monitors, installed through the overburden soils and extending 15 feet into the underlying sound rock.
Read MoreCombined Sewer Overflow Tunnel
The overall project involved the freezing of four shafts excavated by conventional methods, plus an additional two shafts which were raise bored through frozen ground.
Read MoreKansas Underground Salt Museum
Ground freezing was the owner’s method of choice to stabilize more than 135 feet of sand and unstable mudstone overburden to ensure completely dry and stable elevator shaft excavation.
Read More- « Previous Page
- 1
- …
- 5
- 6
- 7
- 8
- 9
- 10
- Next Page »